Not sure if mentioned here yet, but tracker is changing to smart meter only to gut out the waiting list, the requirement should also be on renewals as well.
The live electric graph on octopus mini in the app is I think down to 1 minute intervals. (quick eye ball count of bars).
I think it's every 10 seconds if you change it to the 5 minute graph.