Soldato
- Joined
- 20 Oct 2008
- Posts
- 12,083
I think, to a large extent, it'll depend on whether you get a real BT engineer or a third-party contractor. A contractor will probably be on piece rate and want to be out of there as soon as humanly possible.
I also get the impression that there's now a subclass of engineer who only know enough to perform the basic VDSL install. If anything complicated crops up they aren't in a position to do much about it and have to call for help (or run away).
I also get the impression that there's now a subclass of engineer who only know enough to perform the basic VDSL install. If anything complicated crops up they aren't in a position to do much about it and have to call for help (or run away).


and the cessation charge is the cost to close the order on the line outright without migrating to another provider, you wouldn't pay this when migrating with a mac key. You would if you ceased the services at the property all together without migration. Hope that helps you.
upload still the same around the 15mb mark