Wow, really coming together now. Looks ace.

Cheers man, yeah all of a sudden it's just starting to look like I'm getting there now and it is starting to actually look like a room instead of a bomb site... have to admit, it's tiring lol

Right, mini update today, we finally finished the plasterboarding... thank god for that, seemed to take a lot longer than I thought but it's done. So, tomorrow will be doing the stair strings and re-seating the stairs and hopefully have the two mini stages in as well... so, fingers crossed we get a nice full day tomorrow.


20201121_133600-jpg.1407080

20201121_133555-jpg.1407079

20201121_133549-jpg.1407078

20201121_133542-jpg.1407077

20201121_162030-jpg.1407081

20201121_162038-jpg.1407083

20201121_162043-jpg.1407084

20201121_162105-jpg.1407085

20201121_162233-jpg.1407095
 
So todays update was stringing the stairs and fitting the stairs permantly and thats been done and also building the side stage areas... and one of them is done.

So to Monday and Tuesday the plasterers are here so we're gonna see some big old changes this week... the finish is in sight...

20201122_174552-jpg.1407848

20201122_174541-jpg.1407849

20201122_174525-jpg.1407850

20201122_174420-jpg.1407851

20201122_172832-jpg.1407855

20201122_174413-jpg.1407852

20201122_174404-jpg.1407853

20201122_170659-jpg.1407856
 
Ok guys the day I've been waiting for... well one of the big milestones... plastering started... so this is where we got to today... was a late start from the plasterer but he worked hard and long and he's coming back tomorrow to do the ceiling... the quality seems spot on, it's so smooth... just what I need obviously....

20201123_213212-jpg.1408527

20201123_213221-jpg.1408528

20201123_213250-jpg.1408529

20201123_213255-jpg.1408530

20201123_213301-jpg.1408531

20201123_213319-jpg.1408533

20201123_213440-jpg.1408534

20201123_215635-jpg.1408535


20201123_213310-jpg.1408663

20201123_213319-jpg.1408664
 
Last edited:
Ok, so all the plastering is now finished... and today was the next milestone windows... I'm absolutely over the moon with them... and transforms the front and inside loads... you'd never now know there was even a garage here...

20201126_100500-jpg.1410358

20201126_100503-jpg.1410359

20201126_144306-jpg.1410360

20201126_144314-jpg.1410361

20201126_144322-jpg.1410362

20201126_144328-jpg.1410363

20201126_144348-jpg.1410364

20201126_144354-jpg.1410365

20201126_144506-jpg.1410366

20201126_144513-jpg.1410367


Cheers Pug
 
What PJ you running for this build?
Hi matey, so I'll be running this lot... 120" Duronic 16:9 Projector Screen, Sony VPL-VW320ES 4K Projector, Denon AVXR6400H Amp 11.2, QAcoustics 3050 Front Standers, 3020 x4 Side/Rear Surrounds, 3090C Centre Speaker, 3070S Sub and QAcoustics QI65S x4 Atmos, Sony X800 4k Player, Toshiba EP30 HD-DVD, XBOneX,

Ok slight update, just to show where I'm going... so all ready and cleaned up for the carpet fitters tomorrow...

So as already said the cut out on the lower stage is for the two seater to slide into which will finish the "Millennium Falcon" stage off nicely even allowing small tables there if needed hahaha...

1606426873276-jpeg.1410620


Plus we've chosen a name for the new cinema room but that will be unveiled nearer the completion.

So, plan is, carpet in 27/11/2020, spark is coming to connect all the final wiring etc... then paint ceiling and walls assuming they're 100% dry 28/11/2020 ... another coat 29/11/2020... get curtains up over all three doors.... and then move the hifi in.... probably from 1st December onwards...


20201126_203349-jpg.1410610

20201126_203356-jpg.1410611

20201126_203408-jpg.1410612
 
Looks amazing, Superb amount of space in there also.
Just wondering why did you build that platform going off the bottom of the stairway? are you keeping the sofa on that?
 
Looks amazing, Superb amount of space in there also.
Just wondering why did you build that platform going off the bottom of the stairway? are you keeping the sofa on that?
Yeah so that 3 seater will go there and the 2 seater that I have (not in the picture obivously), will slide into the recess at the front... I wanted a two tier seating arrangement, so needed the rear stage higher. Will show up better once the carpets in tomorrow I think and the seater is in there on Sunday!
 
Yeah so that 3 seater will go there and the 2 seater that I have (not in the picture obviously), will slide into the recess at the front... I wanted a two-tier seating arrangement, so needed the rear stage higher. Will show up better once the carpets in tomorrow I think and the seater is in there on Sunday!
Ohh that makes sense,I originally thought you were just having the 3 seater in there and that was it, Looks fantastic though and super jealous id love something like this in the future, Looking forward to seeing how it progresses further :)
 
Ok so, sorry but been working 12 hours days at the minute, what with work then doing this cinema room... so, here goes...

Plastering was finiished Wednesday 25th, windows went in 26th and look fantastic... then Friday 27th carpets went in... well nearly went in... as they ran out of carpet and made a bit of a **** up on the measuring leaving me the front small stage and the whole of the stairs short... to say I was cheesed off is an understatement, so tomorrow they're ordering more carpet, however in the mean time, I need carpet ont he stairs so they're coming out to lay something temporary which when my carpet comes in they can replace, obviously free of charge as it's their mistake...

So, since then, I've had to paint all landing upstairs and do some other DIY int he house, then had to paint the ceiling and walls with their first coat etc and measure up doors...

So, this is where we'rte currently at... we're waiting for the spart to connect all lights and sockets now... and then 2nd coat of paint then it'll be fitting the banana plug wall sockets and start getting the stuff in... curtains, poles, speakers, hifit, measuring the height of the screen and all the good stuff... getting close now...

Excuse the poor photos but was in a rush when I took them and also poor light as well... however you get the idea...

20201128_090214-jpg.1413107

20201128_090223-jpg.1413108

20201128_090233-jpg.1413109

20201128_090242-jpg.1413110

20201128_090742-jpg.1413111

20201129_170215-jpg.1413113

20201129_170531-jpg.1413117

20201129_170159-jpg.1413112
 
No subs?!
Yeah as stated just a QAcoustics 3070S, however the plan is next year to go for 2x Monolith 12in THX 500-Watt Subwoofers which will be sweet as, however at the minute I had such a tight budget, and I got a deal... if I need more beef I can swicth for the yamaha in my living room... will see how it goes...
 
Ok so it's been a bad week, the boiler packed in and needed a new pump etc, then the electrical system to the emersion went **** up so... had a lot of problems which has slowed my progress... however... here we are. Ceiling is now complete, 2 layers of black, lights all in, speakers in and projector attached this evening...
Sunday could be a cheeky film if we get our skates on over next couple of days... walls need 2nd coat and cutting in... but nearly there for the basic finish for COP Sunday!

20201203_190621-jpg.1415660
20201203_190632-jpg.1415661
20201203_190702-jpg.1415663
20201203_190715-jpg.1415664
20201203_190937-jpg.1415668
 
BK monos you mean?

Can you get four subs in there?

Highly recommended an antimode BTW

Coming along nicely, living the dream
 