Moved the big boy radiators into the living room and dining room, took 4 people to manoeuvre they, and they are only half sections!
This one will be 29 sections and 1.8m long, kicking out a lot of heat.
The leg section closest to the camera is the half way point and I have to build the rest on to in insitu and then stand it up. Will weigh ~230kg when fully buil.
The room it’s hesting is 5.5x5x3m with 6msq of glazing.
The dining room will have a smaller 23 section, 1.5m cast iron job. Room is a bit smaller, smaller and better glazing and some internal insulation.
This week will be building them up and trying to plumb them in along with the new hall radiators.
Oh and took a few more doors off to be chemically stripped.
5 days turn around on these.
This one will be 29 sections and 1.8m long, kicking out a lot of heat.
The leg section closest to the camera is the half way point and I have to build the rest on to in insitu and then stand it up. Will weigh ~230kg when fully buil.
The room it’s hesting is 5.5x5x3m with 6msq of glazing.
![B0A7C76E4B384B00B82C.jpeg](https://u.cubeupload.com/edwake/B0A7C76E4B384B00B82C.jpeg)
The dining room will have a smaller 23 section, 1.5m cast iron job. Room is a bit smaller, smaller and better glazing and some internal insulation.
![7839BBB7411948B58D5E.jpeg](https://u.cubeupload.com/edwake/7839BBB7411948B58D5E.jpeg)
This week will be building them up and trying to plumb them in along with the new hall radiators.
Oh and took a few more doors off to be chemically stripped.
![03341B69779448ECBE33.jpeg](https://u.cubeupload.com/edwake/03341B69779448ECBE33.jpeg)
5 days turn around on these.