I was going to say that’s an odd way to build it Buffman, then I realised what you’d done with the roof & side walls.
No doubled header supporting the roof beams? That’s potentially a lot of load being transferred through a 2” bit of timber. It would have been safer to have doubled the header to help transfer the load into the studs. You’ve got different joist spacing, but I kept my roof and walls at the same 16” centres so the joists sit dead above the studs.
The joists at either end also sit 1" inside the header on the rake walls to give something for the ceiling sheeting (probably ply) to sit tight against.