:cry: for every one mocking can I get one answer? Can I chase the pipe flush with the plaster and then overboard the lot of will the pipes get condensation/do I need to fill it? :D

Are you not insulating the window wall or did i just read that wrong.
Today's job - just getting started. I bought 3 sheets of board so just doing maths (might cut it out in graphing paper in a min my brain is fried lol).
 
:cry: for every one mocking can I get one answer? Can I chase the pipe flush with the plaster and then overboard the lot of will the pipes get condensation/do I need to fill it? :D
I'm pretty sure you're alright chasing it flush without filling it. You can take a view/optionak wether you'd rather chase it deeper and insulate it.

I presume if you're dabbing boards onto plaster youre going to mechanically fix it afterwards. As otherwise the old plaster is what's holding your boards +tiles..
 
Yeah wouldn't bother filling that if its being boarded over anyway.

Re your pipes, in your situation you might be better off sticking with 22mm , its possible you might want the extra capacity in future.
 
I'm pretty sure you're alright chasing it flush without filling it. You can take a view/optionak wether you'd rather chase it deeper and insulate it.

I presume if you're dabbing boards onto plaster youre going to mechanically fix it afterwards. As otherwise the old plaster is what's holding your boards +tiles..
The tileboard is mechanically fixed - I'm just using adhesive for the insulated plasterboard but that's just going to get painted.

---

The adhesive ran out so I've stopped here. I used the patented @Mason- method which worked wonderfully.

jmfQmIq.jpeg
 
The good cush arrived this morning! So I have the bath, shower, bath taps, toilet etc. ready to go now. I just need the vanity and tiles.

Quick question -- the grohe toilet mount needs at least 135mm space for 90dia pipe or 145mm for 110dia pipe. If I recall it comes with a 90mm pipe out of the unit itself; I can then hook a right and put some of the waste pipe internal, or go immediately out of the wall. I have been advised to go 110 to the waste pipe itself.

This means my false wall needs to be 145mm from the wall at least, which means I have a lot of wasted space where the bath is concerned. I need to frame the wall anyway for the insulation.

On receiving the bath I realised the back edge is enormous (100mm!), so I am thinking of either option 1 or option 2 to relieve a tiny (but meaingful) bit of space:

PZt4AbB.png


Option 1 I recess the bath into the false wall - I'll have a minor challenge with the end panel.

Option 2 I cut in around the bath. I'll have a harder tiling job.

Thoughts?! :D
 
Last edited:
remind me the false wall is predominately for additional insulation and niches ? you can't make that minimal depth and just use the broad bath edge to stand stuff on,
isn't it broad to mount taps through it anyway ?
( I don't understand desire for shower niches at all - the tiling/cleaning/drainage/mold-growth ... )
 
Easier to cut a panel than mess around with tiles, old school plumbers like myself prefer recessing the bath into the wall.
Thanks - I think I will recess the bath and play with the panel.

remind me the false wall is predominately for additional insulation and niches ? you can't make that minimal depth and just use the broad bath edge to stand stuff on,
isn't it broad to mount taps through it anyway ?
( I don't understand desire for shower niches at all - the tiling/cleaning/drainage/mold-growth ... )
The false wall started from the idea of hiding the cistern (I hate toilets with visible cisterns), and an easy way to get plumbing to the toilet. The niche then became a side gig, as the toilet has to be at least 165 from the wall for the waste pipe.

We have never had a niche, but we have one in the current bathroom (an old window that was single skin bricked up) and it has never had mold; and I much prefer it to balancing tat around the edge of the bath.

----------------------

Put in a shift today. Quickly finished the insulation job off:
4g66JBm.jpg

Possibly a bit placebo, but whilst this is only 25mm all around, it feels SIGNIFICANTLY warmer. I hope I can get away with tape rather than a full skim........

First fix of the toilet frame and the wall chaser came out. I didn't realise how quickly this was blocking so the dust went mental. My lungs are killing (masked up but nowhere near enough tbh).
TWOt7lR.jpg


How nuts is this? This cig box was WITHIN the block. This thing has been here since 1930 WITHIN the block, and I just so happened to hit right on top of it.
p632K4z.jpg




Zoomed out on the cig packet
dENadYO.jpg


First drop of 22mm
O2PI8Rc.jpg

^ not shown but I also chased out the wall for the de-fog mirror.

Plan for tomorrow........
1. First fix the towel rad
2. MAYBE first fix the electrics -- I am going to route it to the left hand side of the toilet, so the plugs will be under the future shelf.
3. Lift the 18mm board I put down and trim a bit more off, so I can put the 12mm tileboard on the wall.
4. MAYBE first fix the shower pipe but I am not sure if I have enough 15mm.

I am missing a core bit for the waste pipe - which I haven't tested yet but I am almost certain I will hit the joist because screw me/god hates me.
 
Last edited:
Did my Screwfix run this morning..150 quid lighter on plumbing bits. Madness.

Anyway, in the aqualisa shower system I had a bracket thrown in that I thought would be a gimmick..it looks pretty good tho..the hep2o has gone in well, and standalone it's 50 quid!

Question - with my gaps in the wall, is it stupid to think about whanging a load of foam in there?

9uvG0NL.jpeg
 
Yeah it's flying at the moment. Lost 3 hours to save 20 quid on an IKEA delivery :cry:..picked up the vanity unit and sink..just need to order a grohe tap from Amazon.


Sank the back boxes for the mirror and the towel rad. Towel rad mounted.

BqMtsEJ.jpeg


I've asked the plumber to do:
1. Roof tile vent
2. Waste pipe toilet
3. Waste pipe sink and bath
4. Towel rad pipes
5. Hook up the 22mm to the hot and cold - I've bought 2 ball valves (15 quid each! And Screwfix cocked up the order pick so tried to only give me 1. Luckily they forgot a 25p pattress box else I wouldn't have even checked)

I can pretty much decom the old bathroom as the toilet doesn't work and the bath taps don't work (hot is blocked up). The vanity is the only thing I'll lose but I'm not far from that stage.

I won't get him to fill the towel rad as I can then focus on patching up that wall, painting and final fixing.

Once the towel rad is plumbed I can put the insulation and floorboards down forever.

End is insight....
 
For the electrics, I am planning on hiding some plugs next to the wall mount toilet beneath the shelf. Is there anything bonkers about that idea? I can isolate the mirror, plug the towel rad into a smart plug?

It's well out of the zones from what I can tell, and it's hidden under the shelf so nobody will be using them when wet.

I think I will put an RCD on the outside of the room next to the light switch; this way it is super easy to kill the whole room. Thoughts? Is there tidier places to put them?
 
Last edited:
You shouldnt have a 240v socket within 3m of a water source.

Towel rails or heaters (supplied by 230V) can be installed in this space, but must be permanently wired into a flex outlet or comparable function. The outlet can be switched on either outside or inside, dependent on client preference, but all circuits must 30mA, RCD protected.

Sockets at 230V are not permitted, however if present in spaces beyond three metres, they become agreeable. Again, these sockets must be 30mA, RCD protected.
 
Last edited:
You shouldnt have a 240v socket within 3m of a water source.
For sure; I wonder if I am within the spirit of the regs tho, as the plugs will be hidden under a shelf. The reason I want a plug is because I can make it smart, rather than buying another random app providers smart flex outlet.
 
aren't both the boxes, not sockets, but just switched/fused flex junction boxes/outlets ?

towel rail seems high , like near head height ? could a child use it.
I bought the longest I could find -- ideally two large towels can hook on the corner.

For electrics, I think I am going to RCD the whole room from outside - up high near the door; and then use sockets hidden beneath the shelf. Just makes life easier and it isn't any more dangerous.
 