Well its been a lot of hard work getting the log cabin the way I wanted it, it arrived on the 30th May and was completed on monday 24th June, the last thing was running a 50 metre armoured cable in a 600 mm deep trench from my house down my garden.
Really pleased with it though, loads of space which is good
You should be pleased with it, it's great. That also happens to be my favorite shade of orange too.